FEAT-110
2 - Validation
⧗ 74% · 12 left
OBUSPA: Data model registration ACLs for USP Services
TO DO (12)
2 Phase 2 · Validation — 4/12 to do (67% done)
- Test Plan Successful
- Static Code Analysis
- Critical & Major Issues Resolved
- HL-API stand. at BBF Started
3 Phase 3 · Delivery — 4/4 to do (0% done)
- In Official prplWare Release
- Critical & Major Issues Resolved
- Mean & Minor Issues Resolved
- Auto-generated HL-API identical to approved HL-API
4 Phase 4 · Warranty — 4/4 to do (0% done)
- End of Warranty
- HL-API standardisation supported by BBF
- All known issues resolved
- Report of Issues Fixed Under Warranty
DONE (35)
1 Phase 1 · Contributor — 6 done
- Software Item Code Complete
- Unit tests Code Complete
- CRAM tests Code Complete
- Unit Tests Delivered
- CRAM Tests Delivered
- Test Plan Delivered
1 Phase 1 · prpl — 21 done
- Design/Architecture of SW approved
- Unit tests Code Complete
- Test Plan (Automated) Approved
- Test Plan (Manual/Demo) Approved
- Source Code Available for Inspection
- Demo Success
- Functional Description Approved
- Architecture & Design Document Approved
- HL-API Description Document Aproved (*)
- LL-API Description Document Approved (*)
- Vendor Module Documentation Approved (*)
- Installation Guide Approved (*)
- Configuration Guide Approved (*)
- User Guide Approved (*)
- Doxygen Code Documentation
- ODL Files (*)
- SW Item in feature branch
- DCO Provided
- MR Issued
- Code Build Success (Reference HW)
- Chipset Specific Adaptions Provided (*)
2 Phase 2 · Validation — 8 done
- Implementation Conformity
- Code Conformity
- Unit Tests Successful
- Cram Tests Successful
- Security Vulnerability Test
- Intellectual Propery Rights Assessment
- SPDX Headers Delivered
- Code Merged in Main Branch
FEAT-131
1 - Implementation
⧗ 21% · 37 left
MQTT Client Support (Phase 1)
TO DO (37)
1 Phase 1 · prpl — 17/21 to do (19% done)
- Unit tests Code Complete
- Test Plan (Automated) Approved
- Source Code Available for Inspection
- Demo Success
- HL-API Description Document Aproved (*)
- LL-API Description Document Approved (*)
- Vendor Module Documentation Approved (*)
- Installation Guide Approved (*)
- Configuration Guide Approved (*)
- User Guide Approved (*)
- Doxygen Code Documentation
- ODL Files (*)
- SW Item in feature branch
- DCO Provided
- MR Issued
- Code Build Success (Reference HW)
- Chipset Specific Adaptions Provided (*)
2 Phase 2 · Validation — 12/12 to do (0% done) (status not yet 2 - Validation)
- Implementation Conformity
- Code Conformity
- Unit Tests Successful
- Cram Tests Successful
- Test Plan Successful
- Static Code Analysis
- Security Vulnerability Test
- Intellectual Propery Rights Assessment
- Critical & Major Issues Resolved
- SPDX Headers Delivered
- HL-API stand. at BBF Started
- Code Merged in Main Branch
3 Phase 3 · Delivery — 4/4 to do (0% done)
- In Official prplWare Release
- Critical & Major Issues Resolved
- Mean & Minor Issues Resolved
- Auto-generated HL-API identical to approved HL-API
4 Phase 4 · Warranty — 4/4 to do (0% done)
- End of Warranty
- HL-API standardisation supported by BBF
- All known issues resolved
- Report of Issues Fixed Under Warranty
DONE (10)
1 Phase 1 · Contributor — 6 done
- Software Item Code Complete
- Unit tests Code Complete
- CRAM tests Code Complete
- Unit Tests Delivered
- CRAM Tests Delivered
- Test Plan Delivered
1 Phase 1 · prpl — 4 done
- Design/Architecture of SW approved
- Test Plan (Manual/Demo) Approved
- Functional Description Approved
- Architecture & Design Document Approved
FEAT-132
2 - Validation
⧗ 62% · 18 left
Review and implement prplWare upgrade/backup&restore
TO DO (18)
1 Phase 1 · prpl — 3/21 to do (86% done)
- HL-API Description Document Aproved (*)
- LL-API Description Document Approved (*)
- Vendor Module Documentation Approved (*)
2 Phase 2 · Validation — 7/12 to do (42% done)
- Cram Tests Successful
- Test Plan Successful
- Static Code Analysis
- Security Vulnerability Test
- Critical & Major Issues Resolved
- HL-API stand. at BBF Started
- Code Merged in Main Branch
3 Phase 3 · Delivery — 4/4 to do (0% done)
- In Official prplWare Release
- Critical & Major Issues Resolved
- Mean & Minor Issues Resolved
- Auto-generated HL-API identical to approved HL-API
4 Phase 4 · Warranty — 4/4 to do (0% done)
- End of Warranty
- HL-API standardisation supported by BBF
- All known issues resolved
- Report of Issues Fixed Under Warranty
DONE (29)
1 Phase 1 · Contributor — 6 done
- Software Item Code Complete
- Unit tests Code Complete
- CRAM tests Code Complete
- Unit Tests Delivered
- CRAM Tests Delivered
- Test Plan Delivered
1 Phase 1 · prpl — 18 done
- Design/Architecture of SW approved
- Unit tests Code Complete
- Test Plan (Automated) Approved
- Test Plan (Manual/Demo) Approved
- Source Code Available for Inspection
- Demo Success
- Functional Description Approved
- Architecture & Design Document Approved
- Installation Guide Approved (*)
- Configuration Guide Approved (*)
- User Guide Approved (*)
- Doxygen Code Documentation
- ODL Files (*)
- SW Item in feature branch
- DCO Provided
- MR Issued
- Code Build Success (Reference HW)
- Chipset Specific Adaptions Provided (*)
2 Phase 2 · Validation — 5 done
- Implementation Conformity
- Code Conformity
- Unit Tests Successful
- Intellectual Propery Rights Assessment
- SPDX Headers Delivered
FEAT-172
1 - Implementation
⧗ 62% · 18 left
OBUSPA: Socket Pair for Unprivileged Applications
TO DO (18)
1 Phase 1 · prpl — 6/21 to do (71% done)
- HL-API Description Document Aproved (*)
- LL-API Description Document Approved (*)
- Vendor Module Documentation Approved (*)
- Installation Guide Approved (*)
- Configuration Guide Approved (*)
- User Guide Approved (*)
2 Phase 2 · Validation — 4/12 to do (67% done) (status not yet 2 - Validation)
- Test Plan Successful
- Static Code Analysis
- Critical & Major Issues Resolved
- HL-API stand. at BBF Started
3 Phase 3 · Delivery — 4/4 to do (0% done)
- In Official prplWare Release
- Critical & Major Issues Resolved
- Mean & Minor Issues Resolved
- Auto-generated HL-API identical to approved HL-API
4 Phase 4 · Warranty — 4/4 to do (0% done)
- End of Warranty
- HL-API standardisation supported by BBF
- All known issues resolved
- Report of Issues Fixed Under Warranty
DONE (29)
1 Phase 1 · Contributor — 6 done
- Software Item Code Complete
- Unit tests Code Complete
- CRAM tests Code Complete
- Unit Tests Delivered
- CRAM Tests Delivered
- Test Plan Delivered
1 Phase 1 · prpl — 15 done
- Design/Architecture of SW approved
- Unit tests Code Complete
- Test Plan (Automated) Approved
- Test Plan (Manual/Demo) Approved
- Source Code Available for Inspection
- Demo Success
- Functional Description Approved
- Architecture & Design Document Approved
- Doxygen Code Documentation
- ODL Files (*)
- SW Item in feature branch
- DCO Provided
- MR Issued
- Code Build Success (Reference HW)
- Chipset Specific Adaptions Provided (*)
2 Phase 2 · Validation — 8 done
- Implementation Conformity
- Code Conformity
- Unit Tests Successful
- Cram Tests Successful
- Security Vulnerability Test
- Intellectual Propery Rights Assessment
- SPDX Headers Delivered
- Code Merged in Main Branch
FEAT-264
2 - Validation
⧗ 47% · 25 left
Support configuration of power mode type of the AP
TO DO (25)
1 Phase 1 · prpl — 5/21 to do (76% done)
- HL-API Description Document Aproved (*)
- LL-API Description Document Approved (*)
- Vendor Module Documentation Approved (*)
- ODL Files (*)
- Chipset Specific Adaptions Provided (*)
2 Phase 2 · Validation — 12/12 to do (0% done)
- Implementation Conformity
- Code Conformity
- Unit Tests Successful
- Cram Tests Successful
- Test Plan Successful
- Static Code Analysis
- Security Vulnerability Test
- Intellectual Propery Rights Assessment
- Critical & Major Issues Resolved
- SPDX Headers Delivered
- HL-API stand. at BBF Started
- Code Merged in Main Branch
3 Phase 3 · Delivery — 4/4 to do (0% done)
- In Official prplWare Release
- Critical & Major Issues Resolved
- Mean & Minor Issues Resolved
- Auto-generated HL-API identical to approved HL-API
4 Phase 4 · Warranty — 4/4 to do (0% done)
- End of Warranty
- HL-API standardisation supported by BBF
- All known issues resolved
- Report of Issues Fixed Under Warranty
DONE (22)
1 Phase 1 · Contributor — 6 done
- Software Item Code Complete
- Unit tests Code Complete
- CRAM tests Code Complete
- Unit Tests Delivered
- CRAM Tests Delivered
- Test Plan Delivered
1 Phase 1 · prpl — 16 done
- Design/Architecture of SW approved
- Unit tests Code Complete
- Test Plan (Automated) Approved
- Test Plan (Manual/Demo) Approved
- Source Code Available for Inspection
- Demo Success
- Functional Description Approved
- Architecture & Design Document Approved
- Installation Guide Approved (*)
- Configuration Guide Approved (*)
- User Guide Approved (*)
- Doxygen Code Documentation
- SW Item in feature branch
- DCO Provided
- MR Issued
- Code Build Success (Reference HW)
FEAT-287
1 - Implementation
⧗ 55% · 21 left
SFP Manager: Support for BOSA SFP Modules as xPON Front-Ends: phase 2
TO DO (21)
1 Phase 1 · prpl — 8/21 to do (62% done)
- HL-API Description Document Aproved (*)
- LL-API Description Document Approved (*)
- Vendor Module Documentation Approved (*)
- Installation Guide Approved (*)
- Configuration Guide Approved (*)
- User Guide Approved (*)
- Doxygen Code Documentation
- ODL Files (*)
2 Phase 2 · Validation — 5/12 to do (58% done) (status not yet 2 - Validation)
- Test Plan Successful
- Static Code Analysis
- Security Vulnerability Test
- Critical & Major Issues Resolved
- HL-API stand. at BBF Started
3 Phase 3 · Delivery — 4/4 to do (0% done)
- In Official prplWare Release
- Critical & Major Issues Resolved
- Mean & Minor Issues Resolved
- Auto-generated HL-API identical to approved HL-API
4 Phase 4 · Warranty — 4/4 to do (0% done)
- End of Warranty
- HL-API standardisation supported by BBF
- All known issues resolved
- Report of Issues Fixed Under Warranty
DONE (26)
1 Phase 1 · Contributor — 6 done
- Software Item Code Complete
- Unit tests Code Complete
- CRAM tests Code Complete
- Unit Tests Delivered
- CRAM Tests Delivered
- Test Plan Delivered
1 Phase 1 · prpl — 13 done
- Design/Architecture of SW approved
- Unit tests Code Complete
- Test Plan (Automated) Approved
- Test Plan (Manual/Demo) Approved
- Source Code Available for Inspection
- Demo Success
- Functional Description Approved
- Architecture & Design Document Approved
- SW Item in feature branch
- DCO Provided
- MR Issued
- Code Build Success (Reference HW)
- Chipset Specific Adaptions Provided (*)
2 Phase 2 · Validation — 7 done
- Implementation Conformity
- Code Conformity
- Unit Tests Successful
- Cram Tests Successful
- Intellectual Propery Rights Assessment
- SPDX Headers Delivered
- Code Merged in Main Branch
FEAT-332
1 - Implementation
⧗ 45% · 26 left
Add the possibility to configure the DHCPv6 Client Solicit policy
TO DO (26)
1 Phase 1 · prpl — 6/21 to do (71% done)
- LL-API Description Document Approved (*)
- Vendor Module Documentation Approved (*)
- Installation Guide Approved (*)
- Configuration Guide Approved (*)
- User Guide Approved (*)
- Chipset Specific Adaptions Provided (*)
2 Phase 2 · Validation — 12/12 to do (0% done) (status not yet 2 - Validation)
- Implementation Conformity
- Code Conformity
- Unit Tests Successful
- Cram Tests Successful
- Test Plan Successful
- Static Code Analysis
- Security Vulnerability Test
- Intellectual Propery Rights Assessment
- Critical & Major Issues Resolved
- SPDX Headers Delivered
- HL-API stand. at BBF Started
- Code Merged in Main Branch
3 Phase 3 · Delivery — 4/4 to do (0% done)
- In Official prplWare Release
- Critical & Major Issues Resolved
- Mean & Minor Issues Resolved
- Auto-generated HL-API identical to approved HL-API
4 Phase 4 · Warranty — 4/4 to do (0% done)
- End of Warranty
- HL-API standardisation supported by BBF
- All known issues resolved
- Report of Issues Fixed Under Warranty
DONE (21)
1 Phase 1 · Contributor — 6 done
- Software Item Code Complete
- Unit tests Code Complete
- CRAM tests Code Complete
- Unit Tests Delivered
- CRAM Tests Delivered
- Test Plan Delivered
1 Phase 1 · prpl — 15 done
- Design/Architecture of SW approved
- Unit tests Code Complete
- Test Plan (Automated) Approved
- Test Plan (Manual/Demo) Approved
- Source Code Available for Inspection
- Demo Success
- Functional Description Approved
- Architecture & Design Document Approved
- HL-API Description Document Aproved (*)
- Doxygen Code Documentation
- ODL Files (*)
- SW Item in feature branch
- DCO Provided
- MR Issued
- Code Build Success (Reference HW)
FEAT-63
1 - Implementation
⧗ 60% · 19 left
OBUSPA must use the prplOS implementation of TR-181 Device.Security
TO DO (19)
1 Phase 1 · prpl — 6/21 to do (71% done)
- HL-API Description Document Aproved (*)
- LL-API Description Document Approved (*)
- Vendor Module Documentation Approved (*)
- Installation Guide Approved (*)
- Configuration Guide Approved (*)
- User Guide Approved (*)
2 Phase 2 · Validation — 5/12 to do (58% done) (status not yet 2 - Validation)
- Cram Tests Successful
- Test Plan Successful
- Critical & Major Issues Resolved
- HL-API stand. at BBF Started
- Code Merged in Main Branch
3 Phase 3 · Delivery — 4/4 to do (0% done)
- In Official prplWare Release
- Critical & Major Issues Resolved
- Mean & Minor Issues Resolved
- Auto-generated HL-API identical to approved HL-API
4 Phase 4 · Warranty — 4/4 to do (0% done)
- End of Warranty
- HL-API standardisation supported by BBF
- All known issues resolved
- Report of Issues Fixed Under Warranty
DONE (28)
1 Phase 1 · Contributor — 6 done
- Software Item Code Complete
- Unit tests Code Complete
- CRAM tests Code Complete
- Unit Tests Delivered
- CRAM Tests Delivered
- Test Plan Delivered
1 Phase 1 · prpl — 15 done
- Design/Architecture of SW approved
- Unit tests Code Complete
- Test Plan (Automated) Approved
- Test Plan (Manual/Demo) Approved
- Source Code Available for Inspection
- Demo Success
- Functional Description Approved
- Architecture & Design Document Approved
- Doxygen Code Documentation
- ODL Files (*)
- SW Item in feature branch
- DCO Provided
- MR Issued
- Code Build Success (Reference HW)
- Chipset Specific Adaptions Provided (*)
2 Phase 2 · Validation — 7 done
- Implementation Conformity
- Code Conformity
- Unit Tests Successful
- Static Code Analysis
- Security Vulnerability Test
- Intellectual Propery Rights Assessment
- SPDX Headers Delivered
FEAT-74
1 - Implementation
⧗ 66% · 16 left
Wake-on-LAN (WoL)
TO DO (16)
1 Phase 1 · prpl — 3/21 to do (86% done)
- LL-API Description Document Approved (*)
- Vendor Module Documentation Approved (*)
- Chipset Specific Adaptions Provided (*)
2 Phase 2 · Validation — 5/12 to do (58% done) (status not yet 2 - Validation)
- Static Code Analysis
- Security Vulnerability Test
- Critical & Major Issues Resolved
- HL-API stand. at BBF Started
- Code Merged in Main Branch
3 Phase 3 · Delivery — 4/4 to do (0% done)
- In Official prplWare Release
- Critical & Major Issues Resolved
- Mean & Minor Issues Resolved
- Auto-generated HL-API identical to approved HL-API
4 Phase 4 · Warranty — 4/4 to do (0% done)
- End of Warranty
- HL-API standardisation supported by BBF
- All known issues resolved
- Report of Issues Fixed Under Warranty
DONE (31)
1 Phase 1 · Contributor — 6 done
- Software Item Code Complete
- Unit tests Code Complete
- CRAM tests Code Complete
- Unit Tests Delivered
- CRAM Tests Delivered
- Test Plan Delivered
1 Phase 1 · prpl — 18 done
- Design/Architecture of SW approved
- Unit tests Code Complete
- Test Plan (Automated) Approved
- Test Plan (Manual/Demo) Approved
- Source Code Available for Inspection
- Demo Success
- Functional Description Approved
- Architecture & Design Document Approved
- HL-API Description Document Aproved (*)
- Installation Guide Approved (*)
- Configuration Guide Approved (*)
- User Guide Approved (*)
- Doxygen Code Documentation
- ODL Files (*)
- SW Item in feature branch
- DCO Provided
- MR Issued
- Code Build Success (Reference HW)
2 Phase 2 · Validation — 7 done
- Implementation Conformity
- Code Conformity
- Unit Tests Successful
- Cram Tests Successful
- Test Plan Successful
- Intellectual Propery Rights Assessment
- SPDX Headers Delivered
FEAT-9
1 - Implementation
⧗ 15% · 40 left
TR-181 Standard Cellular Manager (HL1)
TO DO (40)
1 Phase 1 · Contributor — 2/6 to do (67% done)
- CRAM tests Code Complete
- CRAM Tests Delivered
1 Phase 1 · prpl — 18/21 to do (14% done)
- Unit tests Code Complete
- Test Plan (Automated) Approved
- Test Plan (Manual/Demo) Approved
- Source Code Available for Inspection
- Demo Success
- HL-API Description Document Aproved (*)
- LL-API Description Document Approved (*)
- Vendor Module Documentation Approved (*)
- Installation Guide Approved (*)
- Configuration Guide Approved (*)
- User Guide Approved (*)
- Doxygen Code Documentation
- ODL Files (*)
- SW Item in feature branch
- DCO Provided
- MR Issued
- Code Build Success (Reference HW)
- Chipset Specific Adaptions Provided (*)
2 Phase 2 · Validation — 12/12 to do (0% done) (status not yet 2 - Validation)
- Implementation Conformity
- Code Conformity
- Unit Tests Successful
- Cram Tests Successful
- Test Plan Successful
- Static Code Analysis
- Security Vulnerability Test
- Intellectual Propery Rights Assessment
- Critical & Major Issues Resolved
- SPDX Headers Delivered
- HL-API stand. at BBF Started
- Code Merged in Main Branch
3 Phase 3 · Delivery — 4/4 to do (0% done)
- In Official prplWare Release
- Critical & Major Issues Resolved
- Mean & Minor Issues Resolved
- Auto-generated HL-API identical to approved HL-API
4 Phase 4 · Warranty — 4/4 to do (0% done)
- End of Warranty
- HL-API standardisation supported by BBF
- All known issues resolved
- Report of Issues Fixed Under Warranty
DONE (7)
1 Phase 1 · Contributor — 4 done
- Software Item Code Complete
- Unit tests Code Complete
- Unit Tests Delivered
- Test Plan Delivered
1 Phase 1 · prpl — 3 done
- Design/Architecture of SW approved
- Functional Description Approved
- Architecture & Design Document Approved